exnihilo second phase: continued |
Monday, 19 May 2008 09:26 |
A major step today. Scary, exciting, and somewhat insane. Signed a contract to get the wheels rolling on our first and second structure for Exnihilo. Entering into a contract with anyone always makes me a little paranoid but the company we are working with are making the process so easy that I am actually looking forward to it instead of dreading all the potential roadblocks. Working with different companies the last few years in the remodeling of our home has made me a little road weary, but a little wiser. Hiring on anyone to do anything can be a nightmare if you and your contractor are not on the same page, or even if your expectations of quality are not in sinc. That is why after much research the company we chose seemed a perfect fit. Maybe it is a little unrealistic to want the builders to really care about our project, but I really need the experience to be positive and I already have an overwhelming peace about our initial experience. And you have to understand our initial experience has been a dialogue with them since January consisting of me pelting them with questions from siding choices to detailed info about their ability to build something for Long Island. I made myself a bit of a pest, but all the while I never detected a single hint of impatience even though we hadn't even entered into a contract. They even got me in touch with another client building on Long Island who shared valuable info regarding everything from getting your container through customs to cautionary tales. Bryan and I have done a whole lot of the preliminary design work but I am excited to hand off some of that to these new folks who will be working with us and for us in engineering the details like solar power and rainwater cisterns. We will begin the first set of blueprints next week on one of the artist habitats, the first building that will be built on the property. The target is delivery in march 09... What do I mean by delivery? Our buildings will be designed and mostly assembled here. Then those components are put into a container along with whatever finishing materials we choose and shipped to Long Island. In the meantime the foundation will be poured. Delivery is when the building lands on our property where a small team of our Bahamian friends assemble the structure on the pad. We decided on building one of the habitats first (instead of the big building) for a couple of reasons. One is to get a sense of how these things go up and possibly experiencing any kinks with the smaller (easier) unit. Also, it will allow us a place to stay when we build the other larger building, along with acting as a shed for storage of tools and materials. And in order to build the big building we will be selling our house, which is another scary prospect, but will be the next necessary step towards this crazy dream.
|